User menu

August 23, 2012

Bicycle Advisory Committee - August 23, 2012

BICYCLE ADVISORY COMMITTEE
Regular Meeting

Thursday, August 23, 2012
6:30 p.m.
City Hall, Room 408

AGENDA

1. Roll Call – Determination of Quorum

2. Announcements & Acknowledgments

3. Approve Minutes - June 28, 2012 Meeting

4. Public Comment: (Discussion Item)
The public may address the Committee on any matter within the jurisdiction of the Committee. This should not relate to any item on this agenda since the Committee will take public comment after it discusses and/or before voting on each agenda item. The Committee requests that each person limit him/herself to three minutes.

5. Chairman's Report (Information)
- Committee Member Business – Continued openings in Districts 1 and 10; Status on Diversion Hearings; Mayor’s Bike Working Group; GG Park Bicycle Practice Area; Balboa Park Flyover.

6. Committee Member Reports (Information) 

7. MTA Bicycle Program Report – See MTA Bicycle Program Report to the BAC for June 2012 (http://www.sfmta.com/cms/cbike/3170.html).

8. Task Force Reports
a. BART Task Force – Dr. Shirley Johnson will present on BART’s plans for ending the blackout times (30 minutes). https://docs.google.com/file/d/0B7qJ2svk6gEGeGRTMDBHLWVDRHc/edit

9. One Bay Area Grant Program Awards– The Metropolitan Transportation Commission (MTC) will direct $38.8 million in federal transportation funds to San Francisco over the next four years through the One Bay Area Grant Program (OBAG). The San Francisco County Transportation Authority (SFCTA) will be issuing a call for projects in September 2012 to select projects to be funded by OBAG.
Action: Presentation and Discussion
Sponsor: Ben Stupka AICP, CTA Principle Transportation Planner

10. Plan B Embarcadero Improvements – While the MTA is studying the opportunity for an “Embikeadero” two-way cycle track, there is concern that such an aggressive change could be delayed past the critical time, and a ‘Plan B’ with much more conservative changes might alleviate some of the major issues with the anticipated mix of bicycles, peds, and vehicles.
Action: Presentation and Discussion
Sponsor: Marc Brandt, District 3

11. SF Bike Plan Chapter 3 Implementation of Actions – Recently, the MTA revised the policy on allowance of folding bikes on all MUNI/Metro vehicles. The BAC would like to work with the MTA on implementation of the following Actions from the Bike Plan:
3.2 – Bicycle Access on Light Rail Vehicles
3.3 – Clarify Accessibility Guidelines for Bicycles on all MUNI transit vehicles
3.4 – Disabled Bicycle Access and introduction of operator discretion
3.5 – Bicycle Racks on all SFMTA Buses [BAC – Expand to include inside rack on Metro]
Action: Discussion
Sponsor: Bert Hill, Chair

12. Continuing Status Review on Spot Project Requests – The lifting of the Bike Plan injunction has already resulted in a large expansion of bicycle treatments throughout the City. While overall they are working as expected, we have been notified of some necessary spot projects that would clarify and improve use of the routes at little cost:
a. Signage on the ‘Schrader Valve notifying motorists on Schrader with a more conspicuous sign than presently; and notifying westbound cyclists with path cross-hatching and signage to route cyclists to the crossing at Schrader. We still observe a lot of cyclists riding into Stanyan Westbound directly from the Panhandle, many with bike rental bags on the front. – MTA Complete
b. Stockton Contra-Lane Study – Presently cyclists trying to reach the Stockton Tunnel from the South and West have no efficient way to legally ride to the Tunnel. A one block contra-lane from Post to Stockton suggested. – (LTP) To be addressed in subway project planning
c. Improved Signage at for Cesar Chavez Bike Lane at 101 – Cyclists riding on Bayshore Northbound and CC Southbound are often confused about entering and tracking the pathway. Supervisor Cohen recently commented on attempting to ride the Chavez ‘Hairball’. – LTP
d. Polk Street Contra-Flow - LTP
e. Signage at Market and Castro Northbound guiding bicyclists to the 17th/Corbett route, instead of Market Street to Portola Westbound. – Request to review work order
f.
Extend the Post Street bike lane from Steiner to Webster – Request for agenda item with Mayor’s Bicycle Working Group
g. Add a bike signal on Market at the 12th Street intersection – Consider a blinking red bike signal during the second phase of the cross market
h.
Additional signage on Kezar Path between Lincoln Way and 3rd Avenue – Status of Work Order. 5/12
i. Review St. Francis Circle for signage and stencils to clarify cyclist route – Request addition of on-site review in light of Sloat treatments, which direct all cyclists to Junipero Serra, along with other dangers.
j.
Duboce and Market St. – Eastbound Cyclists use Crosswalk – Under Consideration with Wiggle treatments.
k.
Impact of proposed CPMC development on Van Ness and Geary on bike projects in adjacent streets
l. Follow-up on 17th and Harrison Bike Box
m. Innovative Treatment, addition of hash marks on substandard bike lane (12ft.) expansion to universal treatment.
n. Review street treatments at Bosworth and Lyell, leading to San Jose St. ramp.
o. Hairball – Change Cycle signal timing or actuation on Potrero Ave & Cesar Chavez
Action: MTA to report progress
Sponsor: Bicycle Advisory Committee Members

Adjournment 

DISABILITY ACCESS:
Room 408 of City Hall is wheelchair accessible. The closest accessible BART Station is Civic Center, three blocks from City Hall. Accessible MUNI lines serving this location are: #47 Van Ness, and the #71 Haight/Noriega and the F Line to Market and Van Ness and the Metro stations at Van Ness and Market and at Civic Center. For more information about MUNI accessible services, call 923-6142. There is accessible parking in the vicinity of City Hall at Civic Center Plaza and adjacent to Davies Hall and the War Memorial Complex.

Large print copies of the agenda, sign language interpreters, or assistive listening systems can be made available by contacting the DPT staff liaison, Lorraine R. Fuqua, at 415-554-9808.. In order to assist the City’s efforts to accommodate persons with severe allergies, environmental illnesses, multiple chemical sensitivity, or related disabilities, attendees at public meetings are reminded that other attendees may be sensitive to various chemical based products. Please help the City accommodate these individuals.

KNOW YOUR RIGHTS UNDER THE SUNSHINE ORDINANCE
Government's duty is to serve the public, reaching its decisions in full view of the public. Commissions, boards, councils and other agencies of the City and County exist to conduct the people's business. The Sunshine Ordinance assures that deliberations are conducted before the people and that City operations are open to the people's review. For information on your rights under the Sunshine Ordinance (Chapter 67 of the San Francisco Administrative Code) or to report a violation of the ordinance, contact Donna Hall; by mail to Sunshine Ordinance Task Force, 1 Dr. Carlton B. Goodlett Place, Room 244, San Francisco CA 94102 by phone at (415) 554-7724, by fax at (415) 554-7854 or by email at Donna.Hall@sfgov.org Citizens may obtain a free copy of the Sunshine Ordinance by contacting Ms. Hall or by printing Chapter 67 of the San Francisco Administrative Code on the Internet, at http://www.sfgov.org/sunshine.htm Persons from the public may inspect documents referred to on the agenda by contacting our staff liaison, Frank Markowitz at 252-4696.

LOBBYIST ORDINANCE
Individuals and entities that influence or attempt to influence local legislative or administrative action may be required by the San Francisco Campaign and Governmental Conduct Code, Section 2.100, to register and report lobbying activity. For more information about the Lobbyist Ordinance, please contact the Ethics Commission at 30 Van Ness Avenue, Suite 3900, San Francisco, CA 94102, telephone 415-581-2300, fax 415-581-2317, or visit their Web site at www.sfgov.org/ethics/.

Back to Top